We recently received word that our 1st and 2nd floor of windows from Tiltco are ready to be shipped. The timing is good considering that we are pouring the roof this week and interior framing has begun in earnest up to the 3rd floor. Once the windows arrive, they will be installed across the front and back of the building.
back to journalLift & Slide doors